Building Beyond Expectations

Projects Categorized: Advanced Tech & Mission Critical

Lockheed Martin

HANS2 Mechanical Upgrades & Chiller Replacement

Class 100,000 Clean Room Lab

Class 100,000 Clean Room Lab project for an undisclosed prominent DoD Contractor was in support of their cyber security division program and built to Secure Space Construction ICD 705 Standards. Project included; Laser Lab Clean Room, Four (4) Labs and One (1) Staging Area with static-control resilient raised access floors, metal laboratory casework with chem-resin… Read More

Verizon Wireless Regional Headquarters

With extremely critical deadlines and seemingly impossible condensed schedules, Mazzuca Contracting was put to a major challenge for this occupied phased renovation. However, every phase was completed on time with little or no disruptions to Verizon Wireless’s employees or data center. The technical part of this project included downsizing an existing Data Center including removing… Read More

Lockheed Martin

The Lockheed Martin is a 58,821 Square Foot, state-of-the-art facility that houses 250 professionals. The project included 3 self-sustaining laboratories with over 120 total racks and individual electrical metering, raised access flooring, complete power back-up for each laboratory, main building switch gear upgrade, training and conference rooms, administrative space, three separate IT communications networks and… Read More

Ventura Solutions, Inc. (Boeing Intelligence & Analytics)

Ventura Solutions, Inc. is a 58,000+ Square Foot, state-of-the-art facility that will be home to over 250 professionals who will work to develop innovative solutions for their customers’ cyber mission. The facility includes laboratories, training rooms, conference rooms, and administrative space built to promote collaboration among employees, industry partners and customers. This project was under… Read More

Next Century

Next Century was a 28,650 sq ft Project that consisted of 50 % secure Space and 50% unclassified space.  NTC Mazzuca teamed with COPT, Arris, a Design Studio and TAI Engineering to provide Next Century with their beautiful new home.  The Project could not have been completed without the communication and coordination of the entire… Read More

Accenture Federal Services

Accenture Federal Services was a 27,000+ SF, High-end Office Build-out project completed over a 12 week duration. The project consisted of an open office floor plan, and fully integrated AV conference centers with stringent acoustical requirements.  The architectural finishes included carpet, ceramic tile, VCT tile, Interlam panels, Plastic Laminate and Solid Surface reception desk. The… Read More

Lockheed Martin Innovation Center

The Lockheed Martin Innovation Center is a 1,425 Square Foot, state-of-the-art Advanced Tech Innovation Center for employees and clients of Lockheed Martin. The build-out included high-end architectural components and a complex standalone Audio Visual integration system. The projected achieved LEED GOLD CERTIFICATION.

Constellation Energy

This phased project included renovating 46,000 SF of office space for Constellation Power Source Generation (CPSG) at their Brandon Shores Plant, located east of Baltimore, Maryland.  The contract included demolition, office build-out, and major upgrades to the mechanical & electrical systems of a two-story building.  A new generator was installed to provide emergency back up to their computer monitoring systems. … Read More