Johns Hopkins Health System – Two (2) Digital Ortho Imaging Systems
Baltimore, MD
This project included the renovations of approximately 900sf of Rooms #5015, #5015A, #5015B, #5017 and #5011 in the Johns Hopkins Outpatient Center for the installation of two (2) Digital Ortho imaging system. Mazzuca Contracting managed all life safety and environmental criteria including Infection Control Risk Assessment, Coordinated Life Safety Assurance Program and Construction Waste Management Programs with all subcontractors and trades. Mazzuca Contracting coordinated the construction work for Digital Visions Imaging for the installation of their two (2) Digital Ortho Imaging Systems.
Mazzuca Contracting provided all labor, materials, equipment and full time supervision necessary to complete the work. The scope of work included, but was not limited to the following. Selective demolition, concrete, miscellaneous steel, unistrut structural steel system installation, carpentry, mechanical, electrical, plumbing (“MEP”), architectural millwork and interior finishes. With all work being in a patient treatment area, all work completed during off-hours.