Building Beyond Expectations

Posts By:

Class 100,000 Clean Room Lab

Class 100,000 Clean Room Lab project for an undisclosed prominent DoD Contractor was in support of their cyber security division program and built to Secure Space Construction ICD 705 Standards. Project included; Laser Lab Clean Room, Four (4) Labs and One (1) Staging Area with static-control resilient raised access floors, metal laboratory casework with chem-resin… Read More

Johns Hopkins Bayview Medical – Ortho Clinic Renovation

This project included the renovations of Exam Rooms, Cast room, Dexa Scanning Room, Incremental Staff office and support areas, Supply Rooms and Patient care areas. Mazzuca Contracting managed all life safety and environmental criteria including Infection Control Risk Assessment, Coordinated Life Safety Assurance Program and Construction Waste Management Programs with all subcontractors and trades.  Mazzuca… Read More

Johns Hopkins Health System – CE EOS System

This project included the renovations to Room #4101 in the Johns Hopkins Outpatient Center for the installation of a new state of the art EOS low dosage patient imaging system. Mazzuca Contracting managed all life safety and environmental criteria including Infection Control Risk Assessment, Coordinated Life Safety Assurance Program and Construction Waste Management Programs with… Read More

Johns Hopkins Bayview Medical – Cafeteria Renovation

This Multi-Phased renovation project included the renovations of the Doctors Lounge, Staff and Visitor Dining Areas, Food Prep and Food Serveries areas. Project included the total replacement of all existing in ground sanitary lines. Mazzuca Contracting developed critical coordination drawings for all the new Kitchen equipment including exhaust and fire suppression systems. Cafeteria included new… Read More

Grace Community Church

Grace Community Church was a 4800 SF lobby buildout located in Fulton, MD. The scope of work consisted of finishes, a very detailed ceiling layout accommodating three existing skylights, new mechanical and electrical, as well as, two new fireplaces and a coffee bar. The finishes included refinishing the existing doors  with a MOZ Metal finish,… Read More

Medstar Health Center CT & Clinic

The Medstar Brandywine Health Center CT & Clinic will include reception and waiting area improvements expanding the existing waiting Room. Shelled space will be converted to a clinic with 4 Exam Rooms & Staff work areas. A CT imaging suite will be built in existing shell space to include changing and locker rooms, infusion room,… Read More

Bridges Consulting

Bridges Consulting’s new  Innovation & Collaboration Headquarters is a fresh and bright modernized space. The open offices tie to Bridges’ strategic plan goals of increased growth and is a place to support their cyber solutions, big-data applications, and frontier innovations with their distinct culture that delivers impactful solutions.  The space was built to have a… Read More

NewWave Telecom & Technologies

Instead of working in typical cubicle-style workstations, employees at NewWave Telecom and Technologies Inc.’s new collaboration center do their job from a long “open concept” table. The collaboration center’s design is highly modern, and decked out in stark whites and contrasting pops of bright yellow, blue and pink. Open ceilings, glass dividers and cool lighting… Read More